{"id":42958,"date":"2024-08-07T15:30:34","date_gmt":"2024-08-07T21:30:34","guid":{"rendered":"https:\/\/cuernavaca.gob.mx\/?p=42958"},"modified":"2024-08-07T16:39:59","modified_gmt":"2024-08-07T22:39:59","slug":"b1890-07-08-24-sigue-sumando-el-poblado-de-ocotepec-nuevas-vialidades-el-alcalde-de-cuernavaca-inauguro-segunda-etapa-de-avenida-alta-tension","status":"publish","type":"post","link":"https:\/\/cuernavaca.gob.mx\/?p=42958","title":{"rendered":"B1890 07\/08\/24 SIGUE SUMANDO EL POBLADO DE OCOTEPEC NUEVAS VIALIDADES; EL ALCALDE DE CUERNAVACA INAUGUR\u00d3 SEGUNDA ETAPA DE AVENIDA ALTA TENSI\u00d3N"},"content":{"rendered":"<p><strong>\u2022 Se destinaron dos millones 999 mil 520.73 pesos de recursos propios municipales para la rehabilitaci\u00f3n con concreto asf\u00e1ltico, que contempl\u00f3 tambi\u00e9n la construcci\u00f3n de banquetas y guarniciones<\/strong><\/p>\n<p><strong>\u2022 En casi tres a\u00f1os de administraci\u00f3n se han invertido m\u00e1s de 15 millones de pesos para la transformaci\u00f3n de uno de los 12 pueblos originarios de Cuernavaca, el poblado de Ocotepec<\/strong><\/p>\n<p>El presidente municipal de Cuernavaca, Jos\u00e9 Luis Uri\u00f3stegui Salgado, encabez\u00f3 este mi\u00e9rcoles la inauguraci\u00f3n de la obra de rehabilitaci\u00f3n con concreto asf\u00e1ltico de la segunda etapa de la avenida Alta Tensi\u00f3n en el poblado de Ocotepec que tuvo un monto de inversi\u00f3n de dos millones 999 mil 520.73 pesos proveniente del fondo de recursos propios municipales que beneficiar\u00e1 de manera directa a m\u00e1s de dos mil habitantes.<\/p>\n<p>En compa\u00f1\u00eda de la s\u00edndica municipal, Catalina Ver\u00f3nica Atenco P\u00e9rez; de los regidores Wendi Salinas Ruiz, Mireya Delgado Romero y Fernando Carrillo Alvarado, as\u00ed como de los diputados locales, \u00c1ngel Adame Jim\u00e9nez y \u00d3scar Cano Mondrag\u00f3n, el alcalde de Cuernavaca se\u00f1al\u00f3 que en su administraci\u00f3n adem\u00e1s de procurar canalizar recursos a \u00e1reas prioritarias donde menos se hab\u00eda invertido, se han ocupado de que todos los pueblos originarios cuenten con obras, destinando de los m\u00e1s de 550 millones de pesos que se han asignado durante estos casi tres a\u00f1os a obra p\u00fablica, m\u00e1s de 120 millones a la zona norte de la ciudad, como es el poblado de Ocotepec que ha tenido una inversi\u00f3n superior a los 15 millones de pesos, rescatando la calidad de vida de la comunidad.<\/p>\n<p>Al dar la explicaci\u00f3n t\u00e9cnica de la obra, el secretario de Desarrollo Urbano y Obras P\u00fablicas, Demetrio Chavira de la Torre, detall\u00f3 que en un periodo de 30 d\u00edas naturales llevaron a cabo el riego de liga a base de emulsi\u00f3n asf\u00e1ltica FR-3 a raz\u00f3n de 0.70 lt\/m2 en dos mil 778.97 metros cuadrados para colocar la carpeta de siete cent\u00edmetros de espesor de concreto asf\u00e1ltico en caliente en dos mil 778.97 metros cuadrados.<\/p>\n<p>Adem\u00e1s, mencion\u00f3 la construcci\u00f3n de banquetas de 10 cent\u00edmetros de espesor de concreto en 145 metros cuadrados, guarniciones de 15x20x40 cent\u00edmetros de concreto en 414.70 metros lineales y la se\u00f1alizaci\u00f3n con pintura para tr\u00e1fico base solvente color amarillo con microesferas en guarniciones de concreto en 555 metros lineales y el suministro y aplicaci\u00f3n de pintura termopl\u00e1stica con microesferas color blanco para se\u00f1alamiento horizontal en 936 metros lineales.<\/p>\n<p>A nombre del Cabildo, la regidora Wendi Salinas Ruiz, resalt\u00f3 el compromiso que ha tenido el Gobierno Municipal para direccionar los recursos p\u00fablicos a donde m\u00e1s se necesitan, particularmente a los pueblos originarios donde han entregado obras con calidad que no solo mejoran la movilidad, sino tambi\u00e9n la calidad de vida de sus habitantes y usuarios, como es la avenida Alta Tensi\u00f3n que comunica con el poblado de Chamilpa y la colonia Cuauht\u00e9moc, siendo un desahogo cuando se cierran las calles principales del poblado de Ocotepec.<\/p>\n<p>A este reconocimiento al trabajo hecho por la administraci\u00f3n municipal se sum\u00f3 el diputado local, \u00c1ngel Adame Jim\u00e9nez, quien precis\u00f3 que las buenas pr\u00e1cticas que se han tenido para manejar los recursos p\u00fablicos han dado como resultado que muchas colonias y poblados en Cuernavaca cuenten hoy con obras p\u00fablicas que atienden sus necesidades, terminando con el rezago hist\u00f3rico en la materia.<\/p>\n<p>Finalmente, en representaci\u00f3n de los vecinos, V\u00edctor \u00c1vila, integrante del Comit\u00e9 de Obra, agradeci\u00f3 la voluntad del municipio por voltearlos a ver tras varios a\u00f1os de abandono por pasadas administraciones, teniendo hoy una calle bonita y segura para los vecinos y el poblado.<\/p>\n<p>A esta inauguraci\u00f3n de obra asisti\u00f3 tambi\u00e9n la titular de la Delegaci\u00f3n Emiliano Zapata Salazar, Mar\u00eda Salom\u00e9 Salgado Mart\u00ednez y el coordinador del COPLADEMUN, Luis Enrique Mart\u00ednez Catal\u00e1n.<\/p>\n\n\t\t<style type=\"text\/css\">\n\t\t\t#gallery-1 {\n\t\t\t\tmargin: auto;\n\t\t\t}\n\t\t\t#gallery-1 .gallery-item {\n\t\t\t\tfloat: left;\n\t\t\t\tmargin-top: 10px;\n\t\t\t\ttext-align: center;\n\t\t\t\twidth: 33%;\n\t\t\t}\n\t\t\t#gallery-1 img {\n\t\t\t\tborder: 2px solid #cfcfcf;\n\t\t\t}\n\t\t\t#gallery-1 .gallery-caption {\n\t\t\t\tmargin-left: 0;\n\t\t\t}\n\t\t\t\/* see gallery_shortcode() in wp-includes\/media.php *\/\n\t\t<\/style>\n\t\t<div id='gallery-1' class='gallery galleryid-42958 gallery-columns-3 gallery-size-thumbnail'><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/cuernavaca.gob.mx\/?attachment_id=42959'><img width=\"150\" height=\"150\" src=\"https:\/\/cuernavaca.gob.mx\/wp-content\/uploads\/2024\/08\/SIGUE-SUMANDO-EL-POBLADO-DE-OCOTEPEC-NUEVAS-VIALIDADES-EL-ALCALDE-DE-CUERNAVACA-INAUGURO\u0301-SEGUNDA-ETAPA-DE-AVENIDA-ALTA-TENSIO\u0301N-1-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" loading=\"lazy\" \/><\/a>\n\t\t\t<\/dt><\/dl><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/cuernavaca.gob.mx\/?attachment_id=42960'><img width=\"150\" height=\"150\" src=\"https:\/\/cuernavaca.gob.mx\/wp-content\/uploads\/2024\/08\/SIGUE-SUMANDO-EL-POBLADO-DE-OCOTEPEC-NUEVAS-VIALIDADES-EL-ALCALDE-DE-CUERNAVACA-INAUGURO\u0301-SEGUNDA-ETAPA-DE-AVENIDA-ALTA-TENSIO\u0301N-2-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" loading=\"lazy\" \/><\/a>\n\t\t\t<\/dt><\/dl><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/cuernavaca.gob.mx\/?attachment_id=42961'><img width=\"150\" height=\"150\" src=\"https:\/\/cuernavaca.gob.mx\/wp-content\/uploads\/2024\/08\/SIGUE-SUMANDO-EL-POBLADO-DE-OCOTEPEC-NUEVAS-VIALIDADES-EL-ALCALDE-DE-CUERNAVACA-INAUGURO\u0301-SEGUNDA-ETAPA-DE-AVENIDA-ALTA-TENSIO\u0301N-3-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" loading=\"lazy\" \/><\/a>\n\t\t\t<\/dt><\/dl><br style=\"clear: both\" \/><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/cuernavaca.gob.mx\/?attachment_id=42962'><img width=\"150\" height=\"150\" src=\"https:\/\/cuernavaca.gob.mx\/wp-content\/uploads\/2024\/08\/SIGUE-SUMANDO-EL-POBLADO-DE-OCOTEPEC-NUEVAS-VIALIDADES-EL-ALCALDE-DE-CUERNAVACA-INAUGURO\u0301-SEGUNDA-ETAPA-DE-AVENIDA-ALTA-TENSIO\u0301N-4-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" loading=\"lazy\" \/><\/a>\n\t\t\t<\/dt><\/dl><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon landscape'>\n\t\t\t\t<a href='https:\/\/cuernavaca.gob.mx\/?attachment_id=42963'><img width=\"150\" height=\"150\" src=\"https:\/\/cuernavaca.gob.mx\/wp-content\/uploads\/2024\/08\/SIGUE-SUMANDO-EL-POBLADO-DE-OCOTEPEC-NUEVAS-VIALIDADES-EL-ALCALDE-DE-CUERNAVACA-INAUGURO\u0301-SEGUNDA-ETAPA-DE-AVENIDA-ALTA-TENSIO\u0301N-5-150x150.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" loading=\"lazy\" \/><\/a>\n\t\t\t<\/dt><\/dl>\n\t\t\t<br style='clear: both' \/>\n\t\t<\/div>\n\n","protected":false},"excerpt":{"rendered":"<p>\u2022 Se destinaron dos millones 999 mil 520.73 pesos de recursos propios municipales para la rehabilitaci\u00f3n con concreto asf\u00e1ltico, que contempl\u00f3 tambi\u00e9n la construcci\u00f3n de banquetas y guarniciones \u2022 En casi tres a\u00f1os de administraci\u00f3n se han invertido m\u00e1s de 15 millones de pesos para la transformaci\u00f3n de uno de los 12 pueblos originarios de [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":42960,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[1],"tags":[121,515,3761,206,356,232,358,127],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/cuernavaca.gob.mx\/index.php?rest_route=\/wp\/v2\/posts\/42958"}],"collection":[{"href":"https:\/\/cuernavaca.gob.mx\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cuernavaca.gob.mx\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cuernavaca.gob.mx\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/cuernavaca.gob.mx\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=42958"}],"version-history":[{"count":1,"href":"https:\/\/cuernavaca.gob.mx\/index.php?rest_route=\/wp\/v2\/posts\/42958\/revisions"}],"predecessor-version":[{"id":42964,"href":"https:\/\/cuernavaca.gob.mx\/index.php?rest_route=\/wp\/v2\/posts\/42958\/revisions\/42964"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cuernavaca.gob.mx\/index.php?rest_route=\/wp\/v2\/media\/42960"}],"wp:attachment":[{"href":"https:\/\/cuernavaca.gob.mx\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=42958"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cuernavaca.gob.mx\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=42958"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cuernavaca.gob.mx\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=42958"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}